Climate Adaptation
Asset-level adaptation planning · DAPP-aligned · Mitigation tracking
Assets with Plans
3/3
Nigeria, Accra, Nairobi
Adaptation Measures
11
Across all assets
Total Adapt. Capex
$6.8M
3-year investment
Risk Reduction
−38%
Revenue at risk post-adaptation
From $31.7M to $19.7M
Nigeria Plant — Coastal flood · Urban heat
Perimeter flood bund (1.4m)
Flood event probability −65%
Flood-proofing ground-level equipment
Asset damage −40%
Cool roof & shade structures
Heat stress days −30%
Emergency flood response plan
Downtime −50% per event
Accra Facility — Heat stress · Drought
Water recycling & storage tanks
Water scarcity exposure −60%
Evaporative cooling upgrade
Productivity loss −25%
Dual-source water agreement
Supply disruption −70%
Nairobi Depot — Drought · Water scarcity
Rainwater harvesting system
Water cost +0% in drought
Inventory buffer (60-day)
Supply chain disruption −50%
Drought early-warning alerts
Response time −14 days
Alternative logistics route
Operational continuity +90%
Download your Climate Adaptation report.
Create a free account to generate and export audit-ready reports for Meridian Manufacturing Ltd..